2:00 AM
Bulletins (NEW YORK) NEW ENGLAND THRUWAY (I-95) NORTHBOUND BETWEEN EXIT 14 (HUTCHINSON RIVER PKWY) AND EXIT 17 (CHATSWORTH AVE) ROAD CONSTRUCTION. TWO LANES CLOSED UNTIL 6AM
2:00 AM
Incidents NEW YORK STATE THRUWAY IN BOTH DIRECTIONS BETWEEN EXIT 11 (RT 9 W) AND TAPPAN ZEE BRIDGE (ROCKLAND COUNTY) ROAD CONSTRUCTION. TWO LANES CLOSED UNTIL 6AM
2:00 AM
Incidents (MILFORD CITY (REMAINDER)) I-95 (CONNECTICUT TPKE) SOUTHBOUND BETWEEN EXIT 39 (MILFORD) AND EXIT 35 (MILFORD) ROAD CONSTRUCTION CONSTRUCTION BLOCKS ALTERNATE LANES UNTIL 6AM... THEN AT EXIT 27 (BRIDGEPORT) CONSTRUCTION CLOSES THE OFF RAMP UNTIL 6AM ** FOLLOW POSTED DETOURS **
2:00 AM
Incidents (HARRISON) I-287 (CROSS WESTCHESTER XPWY) WESTBOUND BETWEEN EXIT 9 A (I-684) AND EXIT 7 (TACONIC STATE PKWY) ROAD CONSTRUCTION. LEFT LANE CLOSED UNTIL 6AM // EASTBOUND BETWEEN EXIT 1 (RT 9A) AND EXIT 2 (RT 119) RIGHT LANE CONSTRUCTION UNTIL 6AM ... THEN BETWEEN EXIT 5 (RT 100) AND EXIT 8 (WESTCHESTER AVE) RIGHT LANE CONSTRUCTION UNTIL 6AM
2:00 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: TAPPAN ZEE BRIDGE (ROCKLAND-BOUND) ROAD CONSTRUCTION. THREE LANES CLOSED 6AM // WESTCHESTER BOUND ROADWAY REDUCED TO TWO LANES
2:00 AM
Transit METRO NORTH TRAINS NO PROBLEMS TO REPORT
2:00 AM
Long Term Construction (MOUNT VERNON) BRONX RIVER PKWY NORTHBOUND BEFORE OAK STREET CONSTRUCTION WORK . WITH THE RIGHT LANE CLOSED AROUND THE CLOCK THROUGH APRIL 30, 2010. (**NOTE: CLOSED TO BUILD A NEW EXIT RAMP) (WESTCHESTER)
2:00 AM
Long Term Construction (POUGHKEEPSIE) S GRAND AVE IN BOTH DIRECTIONS BETWEEN HOOKER AVE AND ROUTE 44 ROAD CONSTRUCTION WITH ALTERNATE LANE CLOSURES DAILY FROM 7 AM UNTIL 530 PM THRU DECEMBER 2008. (DUTCHESS COUNTY)
2:00 AM
Long Term Construction (DOVER) DOG TAIL CORNERS RD IN BOTH DIRECTIONS AT HWY 55 CLOSED . DUE TO CONSTRUCTION THROUGH NOVEMBER. A DETOUR IS POSTED. (DUCHESS COUNTY)
2:00 AM
Long Term Construction (PEEKSKILL) US 9 ROAD CONSTRUCTION ...SINGLE LANE OF TRAFFIC IN EACH DIRECTION BETWEEN MAIN STREET AND SOUTH STREET AROUND THE CLOCK FOR LONG TERM WORK (2 YEARS), EXPECT DELAYS, ESPECIALLY IN THE MORNING AND AFTERNOON RUSH (ACCORDING TO PEEKSKILL P.D.) (WESTCHESTER)
2:00 AM
Long Term Construction (NEW ROCHELLE) QUAKER RIDGE RD IN BOTH DIRECTIONS BETWEEN SUSSEX RD AND WEAVER STREET CONSTRUCTION WORK - ROADWAY HAS BEEN REDUCED TO TWO LANES (ONE LANE FOR EASTBOUND, AND ONE LANE FOR WESTBOUND) UNTIL APRIL 3, 2009. (WESTCHESTER)
2:00 AM
Long Term Construction (NEW HAVEN) TEMPLE ST BETWEEN TRUMBULL ST AND GROVE STREET CLOSED UNTIL DECEMBER 31ST, 2008 DUE TO ONGOING ROAD CONSTRUCTION FOR BRIDGE REPLACEMENT. ALTERNATE ROUTES ARE POSTED. (CONNECTICUT)
2:00 AM
Incidents L.I.E. (I-495) IN BOTH DIRECTIONS BETWEEN WILLIAM FLOYD PKWY (CR 46) / EXIT 68 AND WADING RIVER RD (CR 25) / EXIT 69 ROAD CONSTRUCTION. TWO LANES CLOSED ON THE SERVICE RD UNTIL 6 AM // WESTBOUND AT EXIT 71 (EDWARDS AV) TWO LANES CLOSED UNTIL 6 AM
2:00 AM
Incidents (BRENTWOOD) SAGTIKOS STATE PKWY SOUTHBOUND BETWEEN EXIT S 1 (L.I.E. / I-495) AND EXIT S 2 (CROOKED HILL RD) ROAD CONSTRUCTION. LEFT LANE CLOSED UNTIL 5 AM
2:00 AM
Transit LONG ISLAND MAC ARTHUR AIRPORT NO PROBLEMS TO REPORT
2:00 AM
Long Term Construction (WANTAGH) WANTAGH STATE PKWY SOUTHBOUND BETWEEN JONES BEACH TOLL BOOTHS AND SOUTH OF EXISTING SLOOP CHANNEL BRIDGE ROAD CONSTRUCTION. RIGHT LANE CLOSED 24 HRS
2:00 AM
Long Term Construction (HICKSVILLE) TOWN OF OYSTER BAY PARKING GARAGE CLOSED ++ LIRR COMMUTERS ARE ADVISED TO PARK IN THE SOUTHWEST LOT AT THE BROADWAY MALL OR AT SEARS..SHUTTLE SERVICE WILL BE PROVIDED DURING RUSH HOURS (WEEKDAYS) BY THE TOWN OF OYSTER BAY
2:00 AM
Long Term Construction ROBERT MOSES CSWY ROAD CONSTRUCTION + BLOCKS 1 LANE IN BOTH DIRECTIONS + AT THE GREAT SOUTH BAY BRIDGE ++ 24 HRS ++
2:01 AM
Bulletins (NEW YORK) NEW YORK CITY RESTRICTIONS ALTERNATE SIDE OF THE STREET PARKING RULES WILL BE IN EFFECT EVERYDAY UNTIL THANKSGIVING (THURSDAY, NOVEMBER 27TH)...THE FIRST OF THE GRIDLOCK ALERT DAYS WILL BE FRIDAY, NOVEMBER 21ST + EXPECT DELAYS AND USE MASS TRANSIT IF POSSIBLE
2:01 AM
Bulletins HUDSON RIVER CROSSINGS: OUTBOUND LINCOLN TUNNEL NO PROBLEMS TO REPORT // INBOUND HELIX CLOSED DUE TO CONSTRUCTION UNTIL 5AM *** CENTER TUBE CLOSED WITH OVERNIGHT CONSTRUCTION UNTIL 5AM ***
2:05 AM
Bulletins UPPER EAST RIVER CROSSINGS: TRIBOROUGH BRIDGE EXPECT DELAYS AND SPORADIC FULL CLOSURES ON THE MANHATTAN SPAN DUE TO TEST LIFTS UNTIL 5AM// BRONX-MANHATTAN BOUND CONSTRUCTION BLOCKS TWO LANES UNTIL 5AM *** THE TRIBORO HAS BEEN OFFICIALLY CHANGED TO THE ROBERT F. KENNEDY BRIDGE ***
2:01 AM
Bulletins (NEW YORK) L.I.E. (I-495) WESTBOUND AT 108TH ST OFF-RAMP CLOSED . DUE TO CONSTRUCTION UNTIL 5AM
2:01 AM
Bulletins (NEW YORK) HUTCHINSON RIVER PKWY IN BOTH DIRECTIONS AT PELHAM PKWY ROAD CONSTRUCTION. TWO LANES CLOSED . UNTIL 5AM
2:01 AM
Incidents (NEW YORK) VAN WYCK XPWY (I-678) NORTHBOUND AT L.I.E. (I-495) ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5AM
2:00 AM
Incidents (NEW YORK) GRAND CENTRAL PKWY EASTBOUND AFTER B.Q.E. / I-278 ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5AM..... THEN AT 94TH ST THE OFF RAMP IS CLOSED WITH CONSTRUCTION UNTIL 5AM
2:00 AM
Incidents (NEW YORK) B.Q.E. (I-278) IN BOTH DIRECTIONS BETWEEN ATLANTIC AV AND CADMAN PLAZA WEST ROAD CONSTRUCTION. LEFT LANE CLOSED UNTIL 5AM
2:01 AM
Incidents (NEW YORK) NEW ENGLAND THRUWAY (I-95) NORTHBOUND AT EXIT 12 (BAYCHESTER AV) ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5AM
2:01 AM
Incidents (NEW YORK) BELT PKWY EASTBOUND AT FLATBUSH AV ROAD CONSTRUCTION. LEFT LANE CLOSED . UNTIL 5AM
2:00 AM
Incidents (NEW YORK) WHITESTONE XPWY (I-678) SOUTHBOUND AT 20TH AV ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5AM
2:01 AM
Incidents (NEW YORK) CROSS BRONX XPWY WESTBOUND AT JEROME AV ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5AM
2:00 AM
Incidents (NEW YORK) STATEN ISLAND XPWY (I-278) EASTBOUND AT HYLAN BLVD ROAD CONSTRUCTION . BLOCKING A LANE UNTIL 5AM
2:21 AM
Incidents (NEW YORK) W 97TH ST EASTBOUND BETWEEN AMSTERDAM AVE AND COLUMBUS AVE CLOSED DUE TO BROKEN WATER MAIN UNTIL 4AM
2:00 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: BROOKLYN BATTERY TUNNEL (INBOUND) NO PROBLEMS TO REPORT // OUTBOUND IS OK *** EAST TUBE CLOSED WITH CONSTRUCTION UNTIL 5AM... WEST TUBE TAKES 2-WAY TRAFFIC ***
2:00 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: QUEENS MIDTOWN TUNNEL INBOUND NO PROBLEMS TO REPORT // OUTBOUND DOING OK
2:00 AM
Bridges and Tunnels BAYONNE BRIDGE (N.J.-BOUND) NO PROBLEMS TO REPORT // STATEN ISLAND BOUND MOVING FINE
2:00 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: INBOUND GEORGE WASHINGTON BRIDGE UPPER LEVEL ROAD CONSTRUCTION. TWO LANES CLOSED UNTIL 5AM...... LOWER IS OK *** LOWER LEVEL AND PALISADES PKWY APPROACHES EZ PASS ONLY UNTIL 6AM *** // OUTBOUND EXPECT DELAYS DUE TO THE CONSTRUCTION ON 95
2:00 AM
Bridges and Tunnels (NEW YORK) VERRAZANO NARROWS BRIDGE (BROOKLYN-BOUND UPPER LEVEL) NO PROBLEMS TO REPORT ....LOWER LEVEL CLOSED WITH CONSTRUCTION UNTIL 5AM // STATEN ISLAND BOUND LOWER LEVEL CLOSED WITH CONSTRUCTION UNTIL 5AM... UPPER OK
2:00 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: WILLIAMSBURG BRIDGE (TO MANHATTAN) NO PROBLEMS TO REPORT // BROOKLYN BOUND IS OK
2:00 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: 59TH ST BRIDGE OUTBOUND LOWER LEVEL EXPECT DELAYS .. UPPER LEVEL RIGHT LANE CONSTRUCTION UFN // INBOUND LOWER IS OK...UPPER IS OK *** BOTH DIRECTIONS ROVING CONSTRUCTION BLOCKING ALTERNATE LANES ON THE LOWER LEVEL UNTIL 4AM ***
2:00 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: BROOKLYN BRIDGE (OUTBOUND) NO PROBLEMS TO REPORT // INBOUND IS OK
2:00 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: MANHATTAN BRIDGE (TO MANHATTAN) NO PROBLEMS TO REPORT // BROOKLYN BOUND IS OK
2:00 AM
Bridges and Tunnels OUTERBRIDGE CROSSING (STATEN ISLAND-BOUND) NO PROBLEMS TO REPORT // NEW JERSEY BOUND DOING OK
2:00 AM
Bridges and Tunnels GOETHALS BRIDGE (STATEN ISLAND-BOUND) NO PROBLEMS TO REPORT // NEW JERSEY BOUND DOING OK
2:00 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: THROGS NECK BRIDGE (TO THE BRONX) ROAD CONSTRUCTION. TWO LANES CLOSED UNTIL 5AM // QUEENS BOUND DOING FINE
2:00 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: WHITESTONE BRIDGE (TO QUEENS) NO PROBLEMS TO REPORT // BRONX BOUND IS OK
2:00 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: OUTBOUND HOLLAND TUNNEL SLIGHT DELAYS // INBOUND NO REPORTED DELAYS *** BOTH DIRECTIONS CONSTRUCTION BLOCKING A LANE UNTIL 5AM ***
2:00 AM
Transit LA GUARDIA AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
2:00 AM
Transit NEWARK LIBERTY AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
2:00 AM
Transit JOHN F KENNEDY INTERNATIONAL AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
2:00 AM
Special Events (NEW YORK) 11TH AVE BETWEEN W 34TH ST AND W 40TH ST CLOSED FOR EVENTS ASSOCIATED WITH THE ITS WORLD CONGRESS AT THE JAVITS CONVENTION CENTER FROM 11AM UNTIL 6PM THRU THURSDAY, NOV. 20TH. ALSO CLOSED 34TH, 39TH AND 40TH STS FROM THE WEST SIDE HIGHWAY TO 10TH AVE; AND 35TH TO 38TH STS FROM 10TH TO 11TH AVE.
2:00 AM
Parking Regulations (NEW YORK) NEW YORK CITY RESTRICTIONS ALTERNATE SIDE OF THE STREET PARKING RULES WILL BE IN EFFECT EVERYDAY UNTIL THANKSGIVING (THURSDAY, NOVEMBER 27TH)...THE FIRST OF THE GRIDLOCK ALERT DAYS WILL BE FRIDAY, NOVEMBER 21ST + EXPECT DELAYS AND USE MASS TRANSIT IF POSSIBLE
2:00 AM
Long Term Construction (NEW YORK) 2ND AVE BETWEEN E 74TH ST AND E 68TH ST CONSTRUCTION WORK FOR THE SECOND AVE SUBWAY STARTING OCTOBER 6TH...FOUR LANES WILL BE OPEN FROM 7AM TO 10AM AND FROM 3PM TO 7PM; ALL OTHER TIMES THERE WILL BE 3 LANES OPEN. THIS IS PART 2 OF THE CONSTRUCTION PROJECT.
2:00 AM
Long Term Construction (NEW YORK) STATEN ISLAND XPWY (I-278) EASTBOUND AT LILY POND AV CONSTRUCTION WORK . ON THE LILY POND AVE OVERPASS WHICH WILL HAVE A LANE SHIFT....NO LANES WILL BE CLOSED. THIS IS PHASE 3 OF THE LILY POND AVE OVERPASS PROJECT AND IS EXPECTED TO RUN UNTIL SEPTEMBER 2009
2:00 AM
Bulletins (JACKSON) E VETERANS HWY IN BOTH DIRECTIONS BETWEEN BENNETTS MILLS RD AND BUTTERFLY RD CLOSED AND DETOURED DUE TO AN ACCIDENT WITH A DOWNED UTLITY POLE (NO INJURIES) (OCEAN COUNTY)
2:00 AM
Incidents NEW JERSEY TPKE NORTHBOUND BEFORE INTERCHANGE 5 / BURLINGTON MOUNT HOLLY RD ROAD CONSTRUCTION. LEFT LANE CLOSED . UNTIL 5 AM
2:00 AM
Incidents (BRICK TOWNSHIP) GARDEN STATE PKWY NORTHBOUND BEFORE EXIT 74 (FORKED RIVER) ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 4 AM...THEN AT EXIT 91 (BRICK) LEFT LANE CLOSED UNTIL 6 AM
2:00 AM
Long Term Construction (HIGHLANDS) ST RTE 36 IN BOTH DIRECTIONS AT BAY AVE ROAD CONSTRUCTION . ..LONG TERM BRIDGE REPAIRS ON THE SHREWSBURY RIVER BRIDGE...EXPECT DELAYS IN THE AREA
2:00 AM
Long Term Construction (MANASQUAN RIVER BRIDGE) HWY 35 ROAD CONSTRUCTION BETWEEN BRRIELLE AND POINT PLEASANT BEACH..ONGOING BRIDGE RECONSTRUCTION BLOCKING VARIOUS LANES...TWO LANES MAINTAINED ON THE BRIDGE DURING WORK
2:00 AM
Long Term Construction (TOMS RIVER) OAK RIDGE PKWY BETWEEN WHITESVILLE RD AND CARDINAL DR ROAD CONSTRUCTION ..+BRIDGE REPAIRS+ CAUSING A NEW TRAFFIC PATTERN UNTIL FURTHER NOTICE...EXPECT DELAYS IN THE AREA
2:00 AM
Long Term Construction (BRICK TO BRIELLE) HWY 70 IN BOTH DIRECTIONS BETWEEN HERBERTSVILLE RD AND RIVERVIEW DR ROAD CONSTRUCTION ..+CONSTRUCTION AND REHABILITATION OF THE SEPTEMBER 11 TH MEMORIAL BRIDGE+ UNTIL DECEMBER 2010...EXPECT DELAYS DURING PEAK TRAVEL TIMES
2:00 AM
Long Term Construction (MILLSTONE) PERRINEVILLE RD AT BAIRD RD CLOSED . FOR ONGOING BRIDGE WORK UNTIL JANUARY...FOLLOW POSTED DETOURS
2:00 AM
Long Term Construction (LINCROFT) SWIMMING RIVER RD BETWEEN MAJESTIC S AND NEWMAN SPRINGS RD ROAD CONSTRUCTION ..ONGOING DRAINAGE INSTALLATION WORK..WEEKDAYS 7 AM - 5 PM UNTIL DECEMBER...FOLLOW POSTED DETOURS DURING CONSTRUCTION
2:00 AM
Long Term Construction (BARNEGAT) W BAY AVE BETWEEN LIGHTHOUSE DR AND NAUTILUS DR ROAD CONSTRUCTION ..LONG TERM WORK BLOCKING VARIOUS LANES...EXPECT DELAYS DURING PEAK TRAVEL TIMES
2:00 AM
Long Term Construction (LACEY TWP) DEERHEAD LAKE DR AT LAKESIDE DR N CLOSED DUE TO ROAD CONSTRUCTION . UNTIL FURTHER NOTICE...FOLLOW POSTED DETOURS
2:00 AM
Bulletins RT 17 SOUTHBOUND AT SHERIDAN AV (WALDWICK) CLOSED . DUE TO AN ACCIDENT INVESTIGATION // NORTHOUND LEFT AND CENTER LANES CLOSED (BERGEN COUNTY)
2:00 AM
Bulletins I-95 SOUTHBOUND BETWEEN GEORGE WASHINGTON BRG AND EXIT 70 (DEGRAW AV) EXPRESS LANES CLOSED FOR ROADWORK, ALL TRAFFIC IS BEING PUSHED TO THE LOCAL LANES UNTIL 5 AM
2:00 AM
Bulletins (NEWARK) PULASKI SKWY (RT 1 / 9) INBOUND BETWEEN RAYMOND BLVD (NEWARK) AND TONNELLE CIRCLE (JERSEY CITY) CLOSED AND DETOURED FOR ROADWORK UNTIL 5:30 AM
2:00 AM
Incidents (HILLSIDE) GARDEN STATE PKWY NORTHBOUND BETWEEN UNION TOLL PLAZA AND EXIT 143 (IRVINGTON) ROAD CONSTRUCTION. LEFT LANE CLOSED UNTIL 6 AM // SOUTHBOUND BETWEEN EXIT 144 (SOUTH ORANGE) AND EXIT 142 (HILLSIDE) LEFT LANE CLOSED UNTIL 6 AM
2:00 AM
Incidents (PARSIPPANY-TROY HILLS TOWNSHIP) I-287 NORTHBOUND BETWEEN EXIT 41 (I-80) AND EXIT 45 (WOONTON ST) ROAD CONSTRUCTION. RIGHT LANE CLOSED UNTIL 5 AM...THEN AT EXIT 22 (RT 202/206) LEFT AND CENTER LANES CLOSED UNTIL 5:30 AM // SOUTHBOUND AT EXIT 21 B (I-78) ROAD CONSTRUCTION. RIGHT LANE CLOSED UNTIL 5 AM
2:00 AM
Incidents (LIVINGSTON/ROSELAND) I-280 IN BOTH DIRECTIONS BETWEEN EXIT 5 (LIVINGSTON AV) AND EXIT 16 (HARRISON AV / ESSEX ST) ROAD CONSTRUCTION VARIOUS LANES CLOSED UNTIL 6 AM
2:00 AM
Incidents (MOUNT ARLINGTON) I-80 WESTBOUND BETWEEN HOWARD BLVD (EXIT 30) AND LANDING RD / RT 10 (EXIT 28) ROAD CONSTRUCTION. LEFT LANE CLOSED AND BETWEEN RT 183 (EXIT 27) AND RT 521 (EXIT 12) RIGHT AND CENTER LANES CLOSED UNTIL 7 AM
2:00 AM
Incidents (NORTH BERGEN) RT 1 & 9 SOUTHBOUND AT SECAUCUS RD ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 5 AM
2:00 AM
Incidents RT 21 SOUTHBOUND BETWEEN RT 7 (BELLEVILLE) AND RIVERSIDE AV (NEWARK) ROAD CONSTRUCTION RIGHT AND CENTER LANES CLOSED UNTIL 5 AM
2:00 AM
Transit NEW JERSEY TRANSIT TRAINS NO PROBLEMS TO REPORT //NJ TRANSIT BUSES AND LIGHT RAIL OPERATING ON OR CLOSE TO SCHEDULE//PATH DOING FINE
2:00 AM
Daily Construction (JERSEY CITY) ST RTE 139 EASTBOUND BETWEEN COVERED RDWY AND JERSEY AVENUE MAJOR ROAD CONSTRUCTION UNTIL 9/1/2009. NEW TRAFFIC PATTERN IN EFFECT ... MOTORISTS PROHIBITED FROM MAKING LEFT TURNS FROM THE NEWARK BAY EXTENSION ONTO JERSEY AVENUE & NO RIGHT TURNS FROM 139 TO JERSEY AVENUE
2:00 AM
Daily Construction (MOUNT ARLINGTON) I-80 IN BOTH DIRECTIONS BETWEEN HOWARD BLVD (EXIT 30) AND LANDING RD / RT 10 (EXIT 28) ROAD CONSTRUCTION - ROCK BLASTING OPERATIONS BETWEEN 9:30 AM AND 2:30 PM MONDAY TO FRIDAY THROUGH DECEMBER. DURING THE ACTUAL BLASTING - ALL LANES WILL BE SUBJECT TO CLOSURE FOR 15 MINUTE INTERVALS.
2:00 AM
Long Term Construction (WAYNE) RT 46 WESTBOUND AT RT 23 ROAD CONSTRUCTION . - THE COMMON RAMP FROM WESTBOUND RT 46 TO NORTHBOUND RT 23 AND WESTBOUND RT 80 - ONLY ONE LANE WILL BE OPEN UNTIL DECEMBER 2008 DUE TO ROAD WORK.. EXPECT DELAYS DURING PEAK TRAVEL TIMES.
2:00 AM
Long Term Construction (NEWARK) HAYNES AVE IN BOTH DIRECTIONS BETWEEN BESSEMER ST AND MEEKER AVE CLOSED AND DETOURED FOR REHABILITATION WORK UNTIL DECEMBER 2008 (ESSEX COUNTY)
2:00 AM
Bulletins (NEWARK) NEW JERSEY TPKE SOUTHBOUND BETWEEN INTERCHANGE 14 / NEWARK AIRPORT / I-78 / BAY EXT AND INTERCHANGE 8 A / FORSGATE DR ROAD CONSTRUCTION CLOSES THE TRUCK LANES UNTIL 5 AM
2:00 AM
Incidents (ROSELLE PARK) CHESTNUT ST BETWEEN W WESTFIELD AVE AND W GRANT AVE CLOSED DUE TO ONGOING CLEANUP OF TUESDAYS +BUILDING FIRE+...DETOURS IN THE AREA..PD REPORT THE CLOSURE WILL LAST UNTIL AT LEAST TOMORROW (11/20) [UNION COUNTY]
2:00 AM
Incidents (FRANKLIN TWP) WESTON CANAL RD IN BOTH DIRECTIONS BETWEEN RANDOLPH RD AND APGAR DR CLOSED UNTIL FURTHER NOTICE DUE TO ROAD DAMAGE CASUED BY YESTERDAY'S +LARGE WATER MAIN BREAK+...FOLLOW POLICE DETOURS IN THE AREA...PD REPORT THE ROAD WILL BE CLOSED UNTIL AT LEAST FIRDAY NIGHT (11/21) (SOMERSET COUNTY)
2:00 AM
Incidents RT 1 & 9 SOUTHBOUND BETWEEN BAYWAY CIRCLE (ELIZABETH) AND I-278 (LINDEN) ROAD CONSTRUCTION. RIGHT LANE CLOSED UNTIL 6 AM
2:00 AM
Incidents (BERKELEY HEIGHTS) I-78 IN BOTH DIRECTIONS BETWEEN EXIT 41 AND EXIT 45 (GLENSIDE AV) ROAD CONSTRUCTION. RIGHT LANE CLOSED UNTIL 6 AM AND BOTH WAYS IN THE LOCAL LANES AT EXIT 55 (LYONS AV) LEFT LANE CLOSED UNTIL 5 AM // WESTBOUND BETWEEN EXIT 13 AND EXIT 11 (UNION) TWO LANES CLOSED UNTI 5 AM // EASTBOUND BETWEEN DELAWARE RIVER BRIDGE AND EXIT 3 VAROUS LANES CLOSED UNTIL 5 AM
2:00 AM
Incidents (LINDEN) RT 27 NORTHBOUND AT WOOD AV ROAD CONSTRUCTION. RIGHT LANE CLOSED . UNTIL 6 AM (UNION COUNTY)
2:00 AM
Incidents (EDISON) RT 1 SOUTHBOUND BETWEEN GRANDVIEW AVE AND MAIN ST ROAD CONSTRUCTION VARIOUS LANE CLOSED UNTIL 5 AM (MIDDLESEX COUNTY)
2:00 AM
Incidents RT 22 (N.J.) IN BOTH DIRECTIONS BETWEEN MOUNTAIN AVE (MOUNTAINSIDE) AND MICHIGAN AVE (UNION) ROAD CONSTRUCTION. LEFT LANE CLOSED UNTIL 5 AM // EASTBOUND AT THOMPSON AV (BRIDGEWATER) RIGHT LANE CLOSED UNTIL 5 AM
2:00 AM
Incidents (LAURENCE HARBOR) GARDEN STATE PKWY NORTHBOUND BETWEEN EXIT 120 (OLD BRIDGE) AND CHEESEQUAKE SERVICE AREA ROAD CONSTRUCTION LEFT AND CENTER LANES CLOSED IN THE LOCAL LANES CLOSED UNTIL 5 AM...THEN BETWEEN EXIT 138 (KENILWORTH) AND EXIT 141 (UNION) LEFT LANE CLOSED UNTIL 6 AM
2:00 AM
Daily Construction (BRIDGEWATER TO BOUND BROOK) E MAIN ST BETWEEN FOOTHILL RD AND MOUNTAIN AVE CLOSED TO THROUGH TRAFFIC FOR BRIDGE WORK UNTIL 11/26...POSTED DETOURS
2:00 AM
Daily Construction (JAMESBURG) BUCKELEW AVE WESTBOUND BETWEEN MARRYOTT ST AND PERGOLA AVE ROAD CONSTRUCTION ..7AM - 5PM MONDAY THROUGH SATURDAY UNTIL THE END OF THE YEAR...EXPECT DELAYS DURING PEAK TRAVEL TIMES
2:00 AM
Long Term Construction (NEW BRUNSWICK) RT 18 SOUTHBOUND AT GEORGE ST ROAD CONSTRUCTION . - LONG TERM ROAD WIDENING PROJECT SCHEDULED UNTIL FURTHER NOTICE. THE NORTHBOUND OFF-RAMP TO GEORGES ST IS CLOSED AS PART OF THE WORK. EXPECT EXTRA HEAVY TRAFFIC THROUGH THE AREA.
2:00 AM
Long Term Construction (EDISON) RT 1 IN BOTH DIRECTIONS BETWEEN I-287 AND GARDEN STATE PKWY ROAD CONSTRUCTION ..LONG TERM ROAD WIDENING PROJECT CLOSING VARIOUS LANES UNTIL AUGUST 2009...EXPECT DELAYS DURING PEAK TRAVEL TIMES AND DURING ACTIVE ROADWORK
2:00 AM
Long Term Construction (EDISON) I-287 NORTHBOUND AT EXIT 1 (RT 1) ROAD CONSTRUCTION . ..+BRIDGE DECK REPAIRS+ BLOCKING TWO LANES OF THE OVERPASS...FOUR LANES ARE MAINTAINED WITH A TWO LANE TEMPORARY BRIDGE TO THE LEFT...TRACTOR TRAILERS ARE PROHIBITED FROM THE TEMPORARY BRIDGE...DELAYS POSSIBLE DURING PEAK TRAVEL TIMES